Kargon
Pose de revêtements muraux

Pose de revêtements muraux

Murs et plafonds

Prix
de25
Inscrivez-vous gratuitement

The price is only for the installation of wall coverings. Materials not included.

Questions frequentes

How long does it take to install wall coverings?

The time frame depends on the area, type of cladding and preparation. A small room is completed in 1 to 2 days. More complex projects with base corrections and finishing work take 3 to 5 days.

Which tile is suitable for a bathroom and kitchen?

We recommend moisture-resistant plasterboard, ceramic tiles or composite panels. They are moisture-resistant and easy to maintain. We use the right adhesives and joints for a long life.

Can it be installed on an existing wall without complete demolition?

Yes, we often work on existing walls after assessing their strength. We prepare, prime and level. If there are serious defects, we offer corrections or lightweight construction for an ideal result.

Comment commander

  1. 1.Decrivez le probleme ou le service souhaite dans le champ de recherche
  2. 2.Recevez des devis de professionnels verifies en quelques minutes
  3. 3.Choisissez le devis et planifiez un horaire qui vous convient

de

il y a 0 min.