Kargon
Montage von Wandverkleidungen

Montage von Wandverkleidungen

Wände und Decken

Preis
ab25
Kostenlos registrieren

The price is only for the installation of wall coverings. Materials not included.

Häufig gestellte Fragen

How long does it take to install wall coverings?

The time frame depends on the area, type of cladding and preparation. A small room is completed in 1 to 2 days. More complex projects with base corrections and finishing work take 3 to 5 days.

Which tile is suitable for a bathroom and kitchen?

We recommend moisture-resistant plasterboard, ceramic tiles or composite panels. They are moisture-resistant and easy to maintain. We use the right adhesives and joints for a long life.

Can it be installed on an existing wall without complete demolition?

Yes, we often work on existing walls after assessing their strength. We prepare, prime and level. If there are serious defects, we offer corrections or lightweight construction for an ideal result.

So bestellen Sie

  1. 1.Beschreiben Sie das Problem oder die gewünschte Leistung im Suchfeld
  2. 2.Erhalten Sie Angebote von verifizierten Fachkräften in Minuten
  3. 3.Wählen Sie das Angebot und vereinbaren Sie einen passenden Termin

von

vor 0 Min.