
Installazione di isolamento termico
Pavimenti
Surface preparation, adhesive application for thermal insulation with the necessary glue.
Domande frequenti
How long does it take to install thermal insulation in an apartment?
The installation time depends on the area, the condition of the base and the complexity of the details. In a standard apartment, external thermal insulation usually takes between a few working days and about two weeks, including preparation, reinforcement and finishing plaster.
What materials do you use for thermal insulation?
The choice of material is determined by the type of building, location and budget. Most often we use EPS and XPS insulation boards, stone wool, as well as specialized systems for facades and roofs. We always consider the material to the specific conditions of the site.
Can thermal insulation be combined with replacing floors and flooring?
Yes, we often combine thermal insulation installation with floor replacement, especially when insulation is done under screed or over unheated rooms. This achieves better comfort and a complete renovation of the interior.
Come ordinare
- 1.Descriva il problema o il servizio desiderato nel campo di ricerca
- 2.Riceva preventivi da professionisti verificati in pochi minuti
- 3.Scelga il preventivo e fissi un orario comodo
